Building Expansion Project

WHAT IS COMING NEXT?
The final painting, roof, and lighting will be applied to our front canopy, allowing sheltered usage for people doing work, meeting with friends, or hosting an event.

Soon the library will see the cost savings from the solar array that was recently installed. A grant for LEED certification will cover the cost of that array.